subject
Mathematics, 22.07.2021 02:20 herchellann302

Tim used a lever to lift a heavy box off the ground. His input work was 50 J and the output work was 40 J. What was the mechanical efficiency of the lever? A.90%
B.30%
C.80%
D.10%

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
The revenue generated by a bakery over x months, in thousands of dollars, is given by the function f(x) = 2(1.2)* the cost of running the bakery forx months, in thousands of dollars, is given by the function g(x) = 2x + 1.4determine the equation for h if h(x) = f(x) - g(x).oa. m(x) = (1-2)*-x-07b.(x) = 2(1 2 - 2x -0.7)h(x) = -2((1.2) + x + 0.7)d.h(x) = 2((12) - x-0.7)
Answers: 1
question
Mathematics, 21.06.2019 22:50
On the first of each month sasha runs a 5k race she keeps track of her times to track her progress her time in minutes is recorded in the table
Answers: 1
question
Mathematics, 22.06.2019 02:30
Lines a and b are perpendicular. if the slope of line a is 3, what is the slope of line b?
Answers: 1
question
Mathematics, 22.06.2019 03:00
Describe how the presence of possible outliers might be identified on the following. (a) histograms gap between the first bar and the rest of bars or between the last bar and the rest of bars large group of bars to the left or right of a gap higher center bar than surrounding bars gap around the center of the histogram higher far left or right bar than surrounding bars (b) dotplots large gap around the center of the data large gap between data on the far left side or the far right side and the rest of the data large groups of data to the left or right of a gap large group of data in the center of the dotplot large group of data on the left or right of the dotplot (c) stem-and-leaf displays several empty stems in the center of the stem-and-leaf display large group of data in stems on one of the far sides of the stem-and-leaf display large group of data near a gap several empty stems after stem including the lowest values or before stem including the highest values large group of data in the center stems (d) box-and-whisker plots data within the fences placed at q1 â’ 1.5(iqr) and at q3 + 1.5(iqr) data beyond the fences placed at q1 â’ 2(iqr) and at q3 + 2(iqr) data within the fences placed at q1 â’ 2(iqr) and at q3 + 2(iqr) data beyond the fences placed at q1 â’ 1.5(iqr) and at q3 + 1.5(iqr) data beyond the fences placed at q1 â’ 1(iqr) and at q3 + 1(iqr)
Answers: 1
You know the right answer?
Tim used a lever to lift a heavy box off the ground. His input work was 50 J and the output work was...
Questions
question
Physics, 25.07.2019 05:30
question
Biology, 25.07.2019 05:30
Questions on the website: 13722360