Mathematics, 25.07.2021 07:20 renaa1221
Complete the statements based on the pie chart.
The two most expensive costs to build a house are the
labor and materials
.
The least expensive cost to build a house is the
agent
.
Ans:
Labor and Materials
Agent
Answers: 3
Mathematics, 21.06.2019 17:10
Consider the following equation -167 + 37 = 49 - 21p select the equation that has the same solution as the given equation. o a. p - 5 + ip = 7 - p ob. +55 + 12p = 5p + 16 c. 2 + 1.25p = -3.75p + 10 d. -14 + 6p = -9 - 6p reset next
Answers: 3
Mathematics, 21.06.2019 18:50
The first few steps in solving the quadratic equation 9x2 + 49x = 22 ? 5x by completing the square are shown. 9x2 + 49x = 22 ? 5x 9x2 + 54x = 22 9(x2 + 6x) = 22 which is the best step to do next to solve the equation by completing the square? 9(x2 + 6x + 3) = 25 9(x2 + 6x + 3) = 49 9(x2 + 6x + 9) = 31 9(x2 + 6x + 9) = 103
Answers: 3
Mathematics, 21.06.2019 20:30
Aswimming pool had 2.5 million liters of water in it. some water evaporated, and then the pool only had 22 million liters of water in it. what percent of the water evaporated?
Answers: 2
Complete the statements based on the pie chart.
The two most expensive costs to build a house are t...
History, 23.03.2020 06:26
English, 23.03.2020 06:26
Mathematics, 23.03.2020 06:27
Biology, 23.03.2020 06:27
Mathematics, 23.03.2020 06:28
English, 23.03.2020 06:28
Mathematics, 23.03.2020 06:28
Biology, 23.03.2020 06:29
Mathematics, 23.03.2020 06:29
Mathematics, 23.03.2020 06:30