A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results: Observation 1 2 3 4 5 Time (secs) 85 89 90 84 70 What is the standard time for this task if the employee worked at a 28 percent faster pace than average and an allowance of 19 percent of the workday is used

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Two cyclists 84 miles apart start riding toward each other at the same. one cycles 2 times as fast as the other. if they meet 4 hours later, what is the speed (in mi/h) of the faster cyclist?
Answers: 1
question
Mathematics, 21.06.2019 19:00
The fence around a quadrilateral-shaped pasture is 3a^2+15a+9 long. three sides of the fence have the following lengths: 5a, 10a-2, a^2-7. what is the length of the fourth side of the fence?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Aremote-controlled boat can travel at 4 feet per second in calm water. the boat traveled 48 feet with the current, and then it traveled 16 feet against the current in the same amount of time. how fast is the current?
Answers: 1
question
Mathematics, 22.06.2019 01:20
Anita has a success rate of 80% on free throws in basketball. she wants to know the estimated probability that she can make exactly four of five free throws in her next game. how can she simulate this scenario? categorize each simulation of this scenario as correct or incorrect.
Answers: 2
You know the right answer?
A methods and measurements analyst needs to develop a time standard for a certain task. In a prelimi...
Questions
question
Spanish, 30.10.2020 08:00
question
Mathematics, 30.10.2020 08:00
question
Mathematics, 30.10.2020 08:00
question
Mathematics, 30.10.2020 08:00
question
Mathematics, 30.10.2020 08:00
question
History, 30.10.2020 08:00
question
Mathematics, 30.10.2020 08:00
Questions on the website: 13722367