subject
Mathematics, 13.08.2021 21:30 mariap3504

n acceptance sampling, when the random sample passes the buyer's incoming test (low number of defects found), the next action taken is: to accept the entire lot of incoming materials. to do additional testing to reduce the risk of accepting a bad-quality lot. to place the lot on hold and wait for additional lots from this seller to be tested to assure consistent good quality. to 100% inspect the lot because some defects were found.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Suppose a ball is dropped fromca height of 6ft. it bounces back up but time it bounces, it reaches only 7/10 of its pervious height. what is the total of each height that the ball reaches after 5 bounces
Answers: 1
question
Mathematics, 21.06.2019 18:20
What is the solution set of the quadratic inequality x^2-5< or equal to 0
Answers: 1
question
Mathematics, 21.06.2019 19:30
The measure of an angle is 117°. what is the measure of a supplementary angle?
Answers: 2
question
Mathematics, 21.06.2019 19:40
The weights of broilers (commercially raised chickens) are approximately normally distributed with mean 1387 grams and standard deviation 161 grams. what is the probability that a randomly selected broiler weighs more than 1,425 grams?
Answers: 2
You know the right answer?
n acceptance sampling, when the random sample passes the buyer's incoming test (low number of defect...
Questions
Questions on the website: 13722361