subject
Mathematics, 16.08.2021 21:00 windline21991

Electric saw A cuts planks at a uniform rate of 150 every 30 seconds, and Electric saw B cuts planks at a uniform rate of 130 every 13 second. Of the 2 saws run simultaneously, how many seconds will take for them to produce a total of 225 planks

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Find the quotient. 50a2 – 98b2 -5a +7b
Answers: 1
question
Mathematics, 21.06.2019 19:30
The pyramid below was dissected by a horizontal plane which shape describes the pyramid horizontal cross section
Answers: 1
question
Mathematics, 22.06.2019 00:20
Maria solved an equation as shown below. what is the solution to maria’s equation?
Answers: 1
question
Mathematics, 22.06.2019 01:30
What is the surface area of the sphere?
Answers: 1
You know the right answer?
Electric saw A cuts planks at a uniform rate of 150 every 30 seconds, and Electric saw B cuts planks...
Questions
question
Mathematics, 25.06.2019 18:00
question
Mathematics, 25.06.2019 18:00
Questions on the website: 13722363