In order to aerate and laser-grade a baseball field, a contractor charges $350, plus $25 per hour for a job. The equation C = 25h + 350 describes the cost, c for a job that takes h hours.
If a job cost $950, how many hours did it take?
h = ?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Which equation represents the line that passes through the points and (4, 10) and (2, 7)? y = 3/2x - 11y = 3/2x +4y = - 3/2x + 19y = - 3/2x + 16
Answers: 2
question
Mathematics, 21.06.2019 17:30
Asailor is looking at a kite. if he is looking at the kite at an angle of elevation of 36and the distance from the boat to the point where the kite is directly overhead is 40 feet, how high is the kite?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Look at the figure below: triangle abc is a right triangle with angle abc equal to 90 degrees. the length of ac is 5 units and the length of ab is 4 units. d is a point above c. triangle adc is a right triangle with angle dac equal to 90 degrees and dc parallel to ab. what is the length, in units, of segment cd?
Answers: 1
question
Mathematics, 21.06.2019 21:30
In triangle △abc, ∠abc=90°, bh is an altitude. find the missing lengths. ah=4 and hc=1, find bh.
Answers: 2
You know the right answer?
In order to aerate and laser-grade a baseball field, a contractor charges $350, plus $25 per hour...
Questions
question
Spanish, 08.09.2020 03:01
question
Mathematics, 08.09.2020 03:01
Questions on the website: 13722367