subject
Mathematics, 06.09.2021 22:40 joynerjaila

A juice factory begins production at 8:00 a. m. A worker is asked to check the total number of bottles capped before going to lunch. At 12:00 p. m., 1600 bottles of juice had been capped. He checks the number of bottles capped a second time halfway between the beginning of his lunch break and the end of his day. In total, 3600 bottles of juice were capped by the time the factory closed at 5:00 p. m. • What time did the worker check the second time?

• How many bottles had been capped at that time?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
When only separate discreet points are graphed it is called?
Answers: 3
question
Mathematics, 21.06.2019 18:50
The table represents a function. what is f(-2)? a.-3 b. -1 c.1 d.3
Answers: 1
question
Mathematics, 21.06.2019 19:30
At 6 1/2 cents per pound of string beans how much does 7 pounds cost
Answers: 1
question
Mathematics, 22.06.2019 00:50
Acube has a volume of 800 cubic inches. whatis the length of an edge of the cube, in inches? a. 23/100b. 43/50c. 83/100d. 1003/2e. 1003/8
Answers: 2
You know the right answer?
A juice factory begins production at 8:00 a. m. A worker is asked to check the total number of bottl...
Questions
question
History, 03.08.2019 07:30
question
History, 03.08.2019 07:30
question
English, 03.08.2019 07:30
Questions on the website: 13722363