A project consists of five activities. Naturally the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing. Optimistic Most Probable Pessimistic Activity Time (hr) Time (hr) Time (hr) Floor sanding 3 4 5 Floor buffing 1 2 3 Paint mixing 0.5 1 1.5 Wall painting 1 2 9 Ceiling painting 1 5.5 7 Construct the PERT/CPM network for this problem on a rough paper. What is the expected completion time of this project? What is the probability that the project can be completed within 9 hr.?
Answers: 2
Mathematics, 21.06.2019 19:00
Atriangle has a side lengths of 18cm, 80 cm and 81cm. classify it as acute obtuse or right?
Answers: 2
Mathematics, 21.06.2019 21:00
Tim open up a new saving account with a $50 deposit and plant to deposit $20 per week into the same account.write an expression to represent the total amount in his savings account.
Answers: 1
Mathematics, 21.06.2019 21:50
Ab and bc are tangent to circle d. find x is ab = 3x + 8 and bc = 26. find x
Answers: 1
A project consists of five activities. Naturally the paint mixing precedes the painting activities....
History, 05.06.2020 02:59
Mathematics, 05.06.2020 02:59
History, 05.06.2020 02:59
Mathematics, 05.06.2020 02:59
Mathematics, 05.06.2020 02:59
English, 05.06.2020 02:59
Mathematics, 05.06.2020 03:00
Mathematics, 05.06.2020 03:00
English, 05.06.2020 03:00