subject
Mathematics, 20.09.2021 04:00 maxi12312345

A manufacturer of bolts has a quality-control policy that requires it to destroy any bolts that are more than 4 standard deviations from the mean. The quality-control engineer knows that the bolts coming off the assembly line have mean length of 10 cm with a standard deviation of 0.10 cm. For what lengths will a bolt be destroyed? A. a bolt will be destroyed if the length is between cm and cm.
B. a bolt will be destroyed if the length is less than cm or greater than cm.
C. a bolt will bs destroyed if the length is less than cm.
D. a bolt will be destroyed if the length is greater than cm.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
There are 12 boy and13 girls in a class. if the teacher randomly chooses a student’s name out of a hat what is the probability it will be a girl
Answers: 2
question
Mathematics, 21.06.2019 17:40
A. 127 cm^2 b. 144.5 cm^2 c. 172 cm^2 d. 50 cm^2
Answers: 2
question
Mathematics, 21.06.2019 18:30
Which equation represents the model shown? a)1/3 divide 1/6 = 2 b)2/3 divide 1/6 = 2/18 c)1/3 divide 1/6 = 1/18 d)2/3 divide 1/6 =4
Answers: 1
question
Mathematics, 21.06.2019 19:00
What is the explicit formula for this sequence? -7, -4, -1, 2, a.) an = 8 + (b - 1)3 b.) an = -7 + (n - 1)3 c.) an = 3 + (n -1) (-7) d.) an = -7 + (n - )
Answers: 1
You know the right answer?
A manufacturer of bolts has a quality-control policy that requires it to destroy any bolts that are...
Questions
question
History, 06.05.2020 08:24
question
Mathematics, 06.05.2020 08:24
Questions on the website: 13722363