A construction worker needs to pour a rectangular slab 28 ft long, 12 ft wide, and 8 in. thick. How many cubic yards of concrete does the worker need? (Assume that the construction worker cannot buy a fraction of a cubic yard of concrete.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Pam buys a sleeve of ball bearings for her skateboard. each of the bearings is 1 1/5 inches wide. the sleeve is 9 3/5 inches long. how many ball bearings are in the sleeve? show your work.
Answers: 3
question
Mathematics, 21.06.2019 22:00
Asquare and an equilateral triangle have the same perimeter. each side the triangle is 4 inches longer than each side of the square. what is the perimeter of the square
Answers: 1
question
Mathematics, 22.06.2019 02:00
Me : julio wears a blue shirt every 3 days. larry wears a blue shirt every 4 days. on april 11, both julio and larry wore a blue shirt. what is the next date that they will both wear a blue shirt?
Answers: 2
question
Mathematics, 22.06.2019 03:00
What percent of $1.00 are a nickel and a dime?
Answers: 3
You know the right answer?
A construction worker needs to pour a rectangular slab 28 ft long, 12 ft wide, and 8 in. thick. How...
Questions
question
Mathematics, 20.09.2020 03:01
question
Mathematics, 20.09.2020 03:01
question
Social Studies, 20.09.2020 03:01
Questions on the website: 13722363