subject
Mathematics, 18.10.2021 01:00 MewsicBox9165

Henry is mixing concrete. To make concrete he needs to mix cement, sand and gravel in the ratio 4 : 3 : 1 by weight.
Henry needs to make 120kg of concrete.
He has 55kg of cement, 45kg of sand and 15kg of gravel.
Which ingredient is Henry short of?
ACement BSand CGravel

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Acircular hot tub located near the middle of a rectangular patio has a diameter of 48 inches. the patio measures 11 feet by 6 feet. what is the area of the patio that is not covered by the hot tub?
Answers: 1
question
Mathematics, 21.06.2019 15:30
The equation respenting the left table is
Answers: 2
question
Mathematics, 21.06.2019 21:30
Tom can paint the fence in 12 hours, but if he works together with a friend they can finish the job in 8 hours. how long would it take for his friend to paint this fence alone?
Answers: 1
question
Mathematics, 21.06.2019 23:10
What is the distance between the points (2, 5) and (5,9)?
Answers: 1
You know the right answer?
Henry is mixing concrete. To make concrete he needs to mix cement, sand and gravel in the ratio 4...
Questions
question
Mathematics, 27.08.2019 14:50
question
Biology, 27.08.2019 14:50
question
Spanish, 27.08.2019 14:50
Questions on the website: 13722359