subject
Mathematics, 07.11.2021 14:00 jerz3151

A manufacturing process produces 500 parts per hour. A sample part is selected about every half-hour, and after five parts are obtained, the average of these five measurements is taken. The quality engineer of this manufacturing process wants to specify a limit for process monitoring for these measurements. What is the name of this specified limit

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Which fraction below is equivalent to 10/12?
Answers: 1
question
Mathematics, 21.06.2019 15:20
Abcd β‰… klmn β‰… pqrs β‰… wxyz given that information, which figures are reflections of abcd?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Three times the sum of a number and seven is negative thirty-six. what is the number?
Answers: 2
question
Mathematics, 21.06.2019 22:00
The birth weights of newborn babies in the unites states follow in a normal distrubution with a mean of 3.4 kg and standard deviation of 0.6 kg. reaserches interested in studying how. children gain weights decide to take random samples of 100 newborn babies and calculate the sample mean birth weights for each sample
Answers: 1
You know the right answer?
A manufacturing process produces 500 parts per hour. A sample part is selected about every half-hour...
Questions
question
Physics, 19.03.2021 14:00
Questions on the website: 13722360