subject
Mathematics, 22.11.2021 20:40 jazlynreyes

Suppose a furniture builder has two models of a bookcase: standard and artisan. The standard model requires 5 hours to assemble and 12 hours for finishing touches. The artisan model requires
2 hours to assemble and 6 hours for finishing touches. Based on their current staffing, they can
manage a maximum number of assembly hours available is 50 per day, and the maximum number
of finishing hours available is 132 per day.
Let x = the number of standard model bookcases produced per day and y = the number of artisan
model bookcases produced per day.
Write the system of inequalities that represents the maximum number of bookcases that can be
produced in one day.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:10
Identify whether the figure has plane symmetry, symmetry about an axis, or neither.
Answers: 1
question
Mathematics, 21.06.2019 20:00
The function models the number of accidents
Answers: 1
question
Mathematics, 21.06.2019 21:30
Which equation is true? i. 56 ÷ 4·7 = 82 ÷ (11 + 5) ii. (24 ÷ 8 + 2)3 = (42 + 9)2 neither i nor ii ii only i and ii i only
Answers: 1
question
Mathematics, 21.06.2019 22:50
Aweekly newspaper charges $72 for each inch in length and one column width. what is the cost of an ad that runs 2 column inches long and 2 columns wide? its not 288
Answers: 1
You know the right answer?
Suppose a furniture builder has two models of a bookcase: standard and artisan. The standard model...
Questions
question
Mathematics, 06.05.2020 04:35
question
English, 06.05.2020 04:35
question
Mathematics, 06.05.2020 04:35
Questions on the website: 13722359