subject
Mathematics, 03.12.2021 01:30 Dessyj3113

A construction crow needs to build a road that will be 20 miles long. The crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long
How much more road does the construction crew need to build?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
What is the equation of the line in point-slope form? y+ 4 = 1/2(x+4) y-4 = 1/2(x + 4) y-0 = 2(x - 4) y-4 = 2(8-0)
Answers: 2
question
Mathematics, 22.06.2019 02:00
Hassan bought a package of tofu. the temperature of the tofu was 14° celsius when hassan put the package into the freezer. he left the tofu in the freezer until it reached –19° celsius. which expressions explain how to find the change in temperature, in degrees celsius, of the package of tofu? select three that apply.
Answers: 1
question
Mathematics, 22.06.2019 03:10
If f(x) = 5х – 2 and g(x) = 2х + 1, find (f – g)(x).
Answers: 1
question
Mathematics, 22.06.2019 04:30
Ahyperbola centered at the origin has a vertex at (-6,0) and a focus at (10,0). what are the directrices?
Answers: 3
You know the right answer?
A construction crow needs to build a road that will be 20 miles long. The crew already completed a s...
Questions
question
Biology, 26.03.2021 01:30
Questions on the website: 13722367