subject
Mathematics, 09.12.2021 16:30 stephstewart1209

Kiara bought fabric to make a dress and a sewing machine. The total cost of her purchase, $80.50, included both the cost of her sewing machine. part (A) Write an equation to determine the cost of fabric per foot.

part (B) Find the cost of fabric per foot

PLS HELP


Kiara bought fabric to make a dress and a sewing machine. The total cost of her purchase, $80.50, i

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Cone w has a radius of 8 cm and a height of 5 cm. square pyramid x has the same base area and height as cone w. paul and manuel disagree on how the volumes of cone w and square pyramid x are related. examine their arguments. which statement explains whose argument is correct and why? paul manuel the volume of square pyramid x is equal to the volume of cone w. this can be proven by finding the base area and volume of cone w, along with the volume of square pyramid x. the base area of cone w is π(r2) = π(82) = 200.96 cm2. the volume of cone w is one third(area of base)(h) = one third third(200.96)(5) = 334.93 cm3. the volume of square pyramid x is one third(area of base)(h) = one third(200.96)(5) = 334.93 cm3. the volume of square pyramid x is three times the volume of cone w. this can be proven by finding the base area and volume of cone w, along with the volume of square pyramid x. the base area of cone w is π(r2) = π(82) = 200.96 cm2. the volume of cone w is one third(area of base)(h) = one third(200.96)(5) = 334.93 cm3. the volume of square pyramid x is (area of base)(h) = (200.96)(5) = 1,004.8 cm3. paul's argument is correct; manuel used the incorrect formula to find the volume of square pyramid x. paul's argument is correct; manuel used the incorrect base area to find the volume of square pyramid x. manuel's argument is correct; paul used the incorrect formula to find the volume of square pyramid x. manuel's argument is correct; paul used the incorrect base area to find the volume of square pyramid x.
Answers: 3
question
Mathematics, 21.06.2019 20:50
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
question
Mathematics, 21.06.2019 22:30
Factor the polynomial by its greatest common monomial factor.
Answers: 1
question
Mathematics, 22.06.2019 00:50
4. a single woman uses an online cash flow calculator which reveals a cash flow of 203. what does this mean?
Answers: 3
You know the right answer?
Kiara bought fabric to make a dress and a sewing machine. The total cost of her purchase, $80.50, in...
Questions
question
Mathematics, 23.02.2021 01:00
question
Physics, 23.02.2021 01:00
question
Biology, 23.02.2021 01:00
question
Chemistry, 23.02.2021 01:00
question
Mathematics, 23.02.2021 01:00
Questions on the website: 13722367