subject
Mathematics, 10.12.2021 18:40 raylener5841

The automobile assembly line operation has a scheduled mean completion time, μ of 14.1 minutes. The standard deviation of completion times is 1.6 minutes. It is claimed that under the new management, the mean completion time has decreased. To test this claim, a random sample of 42 completion times under the new management was taken. The sample had a mean of 13.5 minutes. Assume that the population is normally distributed. Can we support, at the level of significance, the claim that the population mean completion time under new management is less than minutes?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
The height of a flare fired from the deck of a ship in distress can be modeled by h(t)= -2(8t^2-52t-28), where h is the height of the flare above water and t is the time in seconds. a. find the time it takes the flare to hit the water.
Answers: 1
question
Mathematics, 21.06.2019 21:30
A(1,1) b(-3,0) c(-4,-1) d(3,-2) drag it to correct position
Answers: 2
question
Mathematics, 21.06.2019 21:30
Cal's go cart has a gas tank with the dimensions shown below. he uses a gas can that holds 11 gallon of gas, to fill the go cart tank. 11 gallon = 231 inches^3 how many full gas cans will it take to fill the go cart's gas tank?
Answers: 3
question
Mathematics, 21.06.2019 23:00
Square a has a side length of (2x-7) and square b has a side length of (-4x+18). how much bigger is the perimeter of square b than square a?and show all work! you so
Answers: 2
You know the right answer?
The automobile assembly line operation has a scheduled mean completion time, μ of 14.1 minutes. The...
Questions
question
English, 10.10.2020 01:01
question
English, 10.10.2020 01:01
question
Mathematics, 10.10.2020 01:01
Questions on the website: 13722360