subject
Mathematics, 14.12.2021 03:20 alexiasommers41

The construction engineer calculated that he needed 2 support pillars of equal size. He ordered 1/2 of a ton of concrete to make the support pillars. How much concrete did he use for each support pillar? 0) Writyyour answer as a fraction or as a whole or mixed number.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Which transformations could have occurred to map △abc to △a"b"c"? a rotation and a reflection a translation and a dilation a reflection and a dilation a dilation and a rotation
Answers: 1
question
Mathematics, 21.06.2019 18:20
What is the solution set of the quadratic inequality x2- 5< 0? o {xl-55x55{x- 155x55){xl -55x5 15){x1 - 15 sx5/5)
Answers: 2
question
Mathematics, 21.06.2019 19:00
What is the expression in factored form? 225x^2 - 144 a. 9(5x+4)^2 b. 9(5x-4)^2 c. 9(4x+5)(4x-5) d. 9(5x+4)(5x-4)
Answers: 2
question
Mathematics, 21.06.2019 23:10
Determine the required value of the missing probability to make the distribution a discrete probability distribution. x p(x) 3 0.23 4 ? 5 0.51 6 0.08 p(4) = nothing  (type an integer or a decimal.)
Answers: 3
You know the right answer?
The construction engineer calculated that he needed 2 support pillars of equal size. He ordered 1/2...
Questions
question
Mathematics, 28.07.2019 04:33
question
Mathematics, 28.07.2019 04:33
Questions on the website: 13722367