A special drill is used at a construction site to dig holes. A hole is dug to a depth of 2.75 feet when the drill hits rock. The progress slows to 5/6 feet per hour of digging. The depth of the hole must be at least 10 1/2 feet by the end of the day to stay on schedule. What is the minimum amount of time the drill must continue at its present rate to complete the hole on schedule? Select from the drop-down menus to correctly complete the statement.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
John makes $10.50 pers hour what expression represens how much he will make if he works h hours
Answers: 1
question
Mathematics, 21.06.2019 14:30
Ablock of wood is a cube whose side is x in. long. you cut off a 1-inch thick piece from the entire right side. then you cut off a 3-inch thick piece from the entire top of the remaining shape. the volume of the remaining block is 2,002 in3. what are the dimensions of the original block of wood?
Answers: 2
question
Mathematics, 21.06.2019 16:50
1. the wheeling bridge in west virginia is about 307 meters long. if you walk with a stride of about meter, about how many steps would it take you to cross this suspension bridge?
Answers: 1
question
Mathematics, 21.06.2019 17:30
The table shows the balance of a money market account over time. write a function that represents the balance y (in dollars) after t years.
Answers: 3
You know the right answer?
A special drill is used at a construction site to dig holes. A hole is dug to a depth of 2.75 feet w...
Questions
Questions on the website: 13722359