Bramble Merchandise planned to produce 43,800 fleece jackets in its Metairie, Louisiana, factory. Fixed overhead costs for the factory were budgeted to be $571,000. The company actually spent $583,800 on fixed overhead and produced 41,600 jackets. Calculate the fixed overhead spending variance.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Which statement is always true? a negative exponent cannot be part of an expression's numerator. a negative base raised to the power of 2 has a negative value. a negative base raised to the power of 2 has a positive value. any number to the first power is zero.
Answers: 1
question
Mathematics, 21.06.2019 17:00
Evaluate the expression for the given value of the variable. 5×(h+3) for h=7
Answers: 1
question
Mathematics, 21.06.2019 19:10
How many solutions does the nonlinear system of equations graphed below have?
Answers: 2
question
Mathematics, 21.06.2019 20:30
Someone answer asap for ! a ball is rolled down a ramp. the height, f(x), in meters, of the ball x seconds after it is released is modeled by the function f(x) = x²- 10x + 25 for all values of x from 0 to 5. which statement about the ball is true? a. the maximum height of the ball is 5 meters b. the height of the ball increases from 0 to 5 meters above the ground. c. the ball has traveled 5 meters when it reaches the bottom of the ramp. d. the ball has been traveling for 5 seconds when it reaches the bottom of the ramp
Answers: 1
You know the right answer?
Bramble Merchandise planned to produce 43,800 fleece jackets in its Metairie, Louisiana, factory. Fi...