subject
Mathematics, 27.07.2019 10:10 jtingley0502

The local amusement park was interested in the average wait time at their most popular roller coaster at the peak park time (2 p. they selected 13 patrons and had them get in line between 2 and 3 p. m. each was given a stopwatch to record the time they spent in line. the times recorded were as follows (in minutes; mean = 114.15): 118, 124, 108, 116, 99, 120, 148, 118, 119, 121, 45, 130, 118. what is the variance?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
If h(x) = f[tex]h(x) = f[/tex] ° [tex]g) (x)[/tex] and [tex]h(x) = \sqrt[3]{x+3}[/tex], find [tex]g(x)[/tex] if [tex]f(x) = \sqrt[3]{x +2}[/tex] ·
Answers: 1
question
Mathematics, 21.06.2019 16:50
Line l passes through points (0,4) and (3,6) what is the slope of a line that is parallel to line l -2/3 -3/2 2/3 3/2
Answers: 1
question
Mathematics, 21.06.2019 18:00
Find the equation using the point (4,8)
Answers: 2
question
Mathematics, 21.06.2019 19:00
You give a $4 tip for a meal that cost $22. approximately what percent of the bill was your tip?
Answers: 1
You know the right answer?
The local amusement park was interested in the average wait time at their most popular roller coaste...
Questions
question
Mathematics, 30.10.2019 06:31
question
Mathematics, 30.10.2019 06:31
question
French, 30.10.2019 06:31
Questions on the website: 13722359