subject
Mathematics, 30.07.2019 01:40 hePandaKing3750

Luke is building a storage building and needs to have a slab of concrete poured. he knows the contractor charges an initial cost of $95 plus an additional $3.50 per square foot of concrete. which function can be used to determine the cost, in dollars, to pour a concrete slab with an area of x square feet? a) f(x) = 3.5x + 95 b) f(x) = 9.5x + 3.5 c) f(x) = 95x + 3.5 d) f(x) = 98.5x

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Ajar of gumballs contains 4 reds, 2 greens, and 6 blues. what is the probability of getting two blues in a row without replacement?
Answers: 1
question
Mathematics, 21.06.2019 20:00
With finding limits of multi variable !
Answers: 1
question
Mathematics, 21.06.2019 23:00
Analyze the diagram below and complete the instructions that follow. how to find tan
Answers: 2
question
Mathematics, 22.06.2019 01:30
Simplify the rational expression. state any restrictions on the variable. t^2-4t-12 / t-8 the / is a fraction sign.
Answers: 1
You know the right answer?
Luke is building a storage building and needs to have a slab of concrete poured. he knows the contra...
Questions
question
English, 07.05.2021 16:50
question
Physics, 07.05.2021 16:50
question
Mathematics, 07.05.2021 16:50
question
Mathematics, 07.05.2021 16:50
question
Social Studies, 07.05.2021 16:50
question
Physics, 07.05.2021 16:50
Questions on the website: 13722359