subject
Mathematics, 11.10.2019 17:30 uzezi

Mrs. solar is remodeling a house and is looking for a contractor to do the work. she is getting quotes from 3 different contractors, and will hire one of them based on the total cost. each company uses a formula to calculate its fees based on the number of hours the work will take.
2. mrs. solar modeled contractor 2’s fees with the formula y = 150 + 55x. mrs. solar compared contractor 2’s fee to contractor 1’s fee.
(a) what does the difference between 50 and 55 mean in the real-world context?
(b) what does the difference between 200 and 150 mean in the real-world context?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
Figure abcd is a parallelogram. if point c lies on the line x = 2, what is the y-value of point c
Answers: 2
question
Mathematics, 21.06.2019 13:40
Acertain standardized? test's math scores have a? bell-shaped distribution with a mean of 520 and a standard deviation of 105. complete parts? (a) through? (c)
Answers: 1
question
Mathematics, 21.06.2019 20:00
Find the slope of the line passing through a pair of points
Answers: 2
question
Mathematics, 21.06.2019 20:10
Acolony contains 1500 bacteria. the population increases at a rate of 115% each hour. if x represents the number of hours elapsed, which function represents the scenario? f(x) = 1500(1.15)" f(x) = 1500(115) f(x) = 1500(2.15) f(x) = 1500(215)
Answers: 3
You know the right answer?
Mrs. solar is remodeling a house and is looking for a contractor to do the work. she is getting quot...
Questions
question
Mathematics, 03.02.2021 22:40
question
Mathematics, 03.02.2021 22:40
question
Mathematics, 03.02.2021 22:40
question
Biology, 03.02.2021 22:50
question
Mathematics, 03.02.2021 22:50
question
Medicine, 03.02.2021 22:50
question
Mathematics, 03.02.2021 22:50
Questions on the website: 13722359