subject
Physics, 09.09.2019 17:30 slm1595

Aclosed organ pipe and an open organ pipe of same length produce 2 beats/second while vibrating in their fundamental modes. the length of the open organ pipe is halved and that of closed pipe is doubled. then, the number of beats produced per second while vibrating in the fundamental mode is (a) 8 (b) 7 (c) 2 (d) 6 what equation use

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 10:00
If a stone with an original velocity of 0 is falling from a ledgeand takes 8 seconds to hoybthe ground whays the final velocity of the stone
Answers: 2
question
Physics, 22.06.2019 18:30
Asled is being held at rest on a slope that makes an angle θ with the horizontal. after the sled is released, it slidesa distance d1 down the slope and then covers the distance d2 alongthe horizontal terrain before stopping. find the coefficient ofkinetic friction μk between the sled and the ground, assumingthat it is constant throughout the trip. find the coefficient of kinetic frictionμk. express your answer in terms of someor all of the variables d1, d2, and θ.
Answers: 1
question
Physics, 22.06.2019 19:20
The dipole moment of the water molecule (h2o) is 6.17x10^-30 c.m. consider a water molecule located at the origin whose dipole moment p points in the +x-direction. a chlorine ion ( of charge-1.60x10^-19c , is located at x=3.00x10^-9m . assume that is much larger than the separation d between the charges in the dipole, so that the approximate expression for the electric field along the dipole axis can be used. a) find the magnitude of the electric force that the water molecule exerts on the chlorine ion. b) what is the direction of the electric force. -x-direction or +x-direction c) is this force attractive or repulsive?
Answers: 1
question
Physics, 22.06.2019 19:50
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
You know the right answer?
Aclosed organ pipe and an open organ pipe of same length produce 2 beats/second while vibrating in t...
Questions
question
Mathematics, 21.08.2019 19:30
question
Mathematics, 21.08.2019 19:30
question
Social Studies, 21.08.2019 19:30
question
Geography, 21.08.2019 19:30
question
History, 21.08.2019 19:30
Questions on the website: 13722363