subject
Physics, 18.09.2019 16:10 jennaranelli05

The best forecasting methods to use are time series models such as moving average. answer unselected when the future level of some variable is seen as a function of time unselected when historical data are scarce, not available, or irrelevant unselected when little or no data is available unselected when the future level of some variable is seen as a function of something other than time unselected i don't know yet

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 15:30
Most energy in an ecosystem comes originally from_
Answers: 1
question
Physics, 21.06.2019 18:10
After the near spacecraft passed mathilde, on several occasions rocket propellant was expelled to adjust the spacecraft's momentum in order to follow a path that would approach the asteroid eros, the final destination for the mission. after getting close to eros, further small adjustments made the momentum just right to give a circular orbit of radius 45 km (45 Γ— 10^3 m) around the asteroid. so much propellant had been used that the final mass of the spacecraft while in circular orbit around eros was only 545 kg. the spacecraft took 1.04 days to make one complete circular orbit around eros. calculate what the mass of eros must be.
Answers: 1
question
Physics, 21.06.2019 20:20
Ateam of astronauts is on a mission to land on and explore a large asteroid. in addition to collecting samples and performing experiments, one of their tasks is to demonstrate the concept of the escape speed by throwing rocks straight up at various initial speeds. with what minimum initial speed vesc will the rocks need to be thrown in order for them never to "fall" back to the asteroid? assume that the asteroid is approximately spherical, with an average density p 3.84 x108 g/m3 and volume v 2.17 x 1012 m3 recall that the universal gravitational constant is g 6.67 x 10-11 n m2/kg2
Answers: 2
question
Physics, 22.06.2019 05:10
What is the electric force acting between two charges of -0.0045 c and -0.0025 c that are 0.0060 m apart? use fe=kq1q2/r^2 and k = 9.00 x 10^9 n*m^2/c^2 a. 1.7 x 10^7 n b. -1.7 x 10^7 n c. -2.8 x 10^9 n d. 2.8 x 10^9 n
Answers: 1
You know the right answer?
The best forecasting methods to use are time series models such as moving average. answer unselected...
Questions
Questions on the website: 13722367