subject
Physics, 23.10.2019 17:00 jonathanLV6231

The following data resulted from a study taken on a horizontal milling machine: pieces produced per cycle: 8 average measured cycle time: 8.36 min average measured effort time per cycle: 4.62 min average rapid traverse time: 0.08 min average cutting time power feed: 3.66 min performance rating: 115 percent allowance (machine time): 10 percent allowance (effort time): 15 percent the operator works on the job a full 8-h day and produces 380 pieces. how many standard hours does the operator earn? what is the operator’s efficiency for the 8-h day?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 23:30
If 21.2 kcals of energy is released by this reaction, how many kj does the reaction release? (1 cal 4.184 j)
Answers: 1
question
Physics, 22.06.2019 12:30
An ice-making machine inside a refrigerator operates in a carnot cycle. it takes heat from liquid water at 0.0 degrees celsius and rejects heat to a room at a temperature of 19.2 degrees celsius. suppose that liquid water with a mass of 76.3kg at 0.0 degrees celsius is converted to ice at the same temperature. take the heat of fusion for water to be l_f = 3.34*10^5 j/kg.how much energy e must be supplied to the device? express your answer in joules.
Answers: 1
question
Physics, 22.06.2019 12:50
The combining of light nuclei is called blank. blank as in not actually blank. you know what im tryin to say.
Answers: 1
question
Physics, 22.06.2019 14:30
Alandscaper is shopping for landscaping materials. she wants to use materials through which water flows easily. which materials should she choose? check all that apply. clay gravel granite rocks with cracks loosely packed soil
Answers: 2
You know the right answer?
The following data resulted from a study taken on a horizontal milling machine: pieces produced per...
Questions
Questions on the website: 13722360