subject
Physics, 30.10.2019 06:31 jay0626

Aconstruction worker uses 1,000 j of work to screw two boards together. the screw does 855 j of work. calculate the efficiency of the screw.

plz !

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 16:20
Describe how the fermi level changes with donor level, temperature and contact with p and n type semiconductors
Answers: 1
question
Physics, 21.06.2019 21:00
50 g of ice at 0°c is dropped in a beaker containing 100 g of water at 0°c. what will be the contents of the beaker after 5 hours? assume that the room temperature is 0°c.
Answers: 1
question
Physics, 22.06.2019 07:50
Determine the fraction of the magnitude of kinetic energy lost by a neutron (m1 = 1.01 u) when it collides head-on and elastically with a target particle at rest which is 21h (heavy hydrogen, m = 2.01 u).
Answers: 3
question
Physics, 22.06.2019 12:20
Which of the following situations is impossible? a) an object has velocity directed east and acceleration directed east. b) an object has zero velocity but non-zero acceleration. c) an object has constant non-zero velocity and changing acceleration. d) an object has velocity directed east and acceleration directed west. e) an object has constant non-zero acceleration and changing velocity.
Answers: 2
You know the right answer?
Aconstruction worker uses 1,000 j of work to screw two boards together. the screw does 855 j of work...
Questions
question
Mathematics, 03.07.2019 02:30
question
Health, 03.07.2019 02:30
question
Mathematics, 03.07.2019 02:30
question
Chemistry, 03.07.2019 02:30
Questions on the website: 13722359