subject
Physics, 31.10.2019 02:31 yungkxng57

Electric power is to be generated by installing a hydraulic turbine–generator at a site 110 m below the free surface of a large water reservoir that can supply water steadily at a rate of 900 kg/s. if the mechanical power output of the turbine is 800 kw and the electric power generation is 750 kw, determine the turbine efficiency and the combined turbine–generator efficiency of this plant. neglect losses in the pipes.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 20:00
Which of the following represents an upright image? a. -do b. +m c. -m d. +do
Answers: 1
question
Physics, 21.06.2019 20:20
When many atoms are split in a chain reaction, a large explosion occurs. this is an example of what type of energy conservation
Answers: 2
question
Physics, 22.06.2019 00:00
Astate of matter all that has define volume and can flow is a(n)
Answers: 3
question
Physics, 22.06.2019 06:30
Suppose you have a box. which of these is not necessarily a true statement regarding the relationship between the force applied to the box, the work done on the box, and the distance the box is moved? a. if the box is not moved, no force is being applied to the box. b. if no force is applied to the box, no work is done on the box. c. if work is done on the box, then a force is applied to the box. d. if work is done on the box, then the box is moved a distance.
Answers: 2
You know the right answer?
Electric power is to be generated by installing a hydraulic turbine–generator at a site 110 m below...
Questions
question
Mathematics, 28.07.2019 01:30
question
Mathematics, 28.07.2019 01:30
Questions on the website: 13722363