subject
Physics, 14.11.2019 19:31 Mlmyers81

Asmall mass m hangs at rest from a vertical rope of length ℓ that is xed to the ceiling. a force \vec{\bold{f}} then pushes on the
mass, perpendicular to the taut rope at all times, until the rope is oriented at an angle θ = θ0 and the mass has been
raised by a vertical distance h. assume the force’s magnitude f is adjusted so that the mass moves at constant
speed along its curved trajectory. show that the work done by \vec{\bold{f}} during this process equals mgh, which is equivalent to the amount of work it takes to slowly lift a mass m straight up by a height h. [hint: when the angle is increased by dθ (in radians), the mass moves along an arc length ds = ℓ dθ.]

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 18:10
Awheelhas a radius of 4.8 m. howfar (path length) does a point on the circumference travel if thewheel is rotated through angles of 30°, 30 rad, and 30 rev,respectively?
Answers: 3
question
Physics, 22.06.2019 05:40
Karen is running forward at a speed of 9 m/s. she tosses her sweaty headband backward at a speed of 20 m/s. the speed of the headband, to the nearest whole number relative to a stationary observer watching karen
Answers: 1
question
Physics, 22.06.2019 08:30
Individuals who live below the poverty line get seriously ill more often than those who do not what could be the hidden variable in this situation?
Answers: 3
question
Physics, 22.06.2019 14:00
Acar travels 40m in 8 seconds find the car speed
Answers: 1
You know the right answer?
Asmall mass m hangs at rest from a vertical rope of length ℓ that is xed to the ceiling. a force [te...
Questions
question
English, 04.01.2021 16:50
question
Mathematics, 04.01.2021 16:50
question
Mathematics, 04.01.2021 16:50
question
Physics, 04.01.2021 16:50
question
Mathematics, 04.01.2021 16:50
question
Social Studies, 04.01.2021 16:50
Questions on the website: 13722361