Aledge on a building is 18 m above the ground. a taut rope attached to a 4.0-kg can of paint sitting on the ledge passes up over a pulley and straight down to a 3.0-kg can of nails on the ground. if the can of paint is accidently knocked off the ledge, what time interval does a carpenter have to catch the can before it smashes on the floor?
Answers: 2
Physics, 22.06.2019 08:20
At an oceanside nuclear power plant, seawater is used as part of the cooling system. this raises the temperature of the water that is discharged back into the ocean. the amount that the water temperature is raised has a uniform distribution over the interval from 10° to 25° c. what is the standard deviation of the temperature increase?
Answers: 1
Physics, 22.06.2019 10:00
Suppose a wheel with a tire mounted on it is rotating at the constant rate of 2.15 times a second. a tack is stuck in the tire at a distance of 0.373 m from the rotation axis. noting that for every rotation the tack travels one circumference (a) find the tack's tangential speed. (b) what is the tacks radial acceleration?
Answers: 2
Physics, 22.06.2019 10:30
If y gets smaller as x gets bigger and y have an relationship?
Answers: 1
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
Aledge on a building is 18 m above the ground. a taut rope attached to a 4.0-kg can of paint sitting...
Mathematics, 05.03.2021 02:10
Chemistry, 05.03.2021 02:10
Biology, 05.03.2021 02:10
Physics, 05.03.2021 02:10
Mathematics, 05.03.2021 02:10
Mathematics, 05.03.2021 02:10
English, 05.03.2021 02:10
German, 05.03.2021 02:10
Mathematics, 05.03.2021 02:10