In assigning a value for the most pessimistic (b) duration, the project manager should estimate the duration of the activity to have a 99% likelihood that it will take b or less amount of time.
a) true
b) false

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 22:50
Acar of mass m goes around a banked curve of radius r with speed v. if the road is frictionless due to ice, the car can still negotiate the curve if the horizontal component of the normal force on the car from the road is equal in magnitude to 101) a) mv2/r b) mg/2. d) mg e) tan[v2/(eg)]
Answers: 2
question
Physics, 22.06.2019 11:30
Madison pushes with a 210-n horizontal force on a 24-kg crate of coffee resting on a warehouse floor. the force of friction on the crate is 74 n. what is the acceleration?
Answers: 1
question
Physics, 22.06.2019 12:30
Consider a hydrogen atom in the ground state. what is the energy of its electron? =e= jj now consider an excited‑state hydrogen atom. what is the energy of the electron in the =5n=5 level? =e5= j
Answers: 3
question
Physics, 22.06.2019 20:30
Four identical lab carts each have a mass of 200 kg. different masses are added to the carts and the velocities are measured. all carts move to the right.
Answers: 3
You know the right answer?
In assigning a value for the most pessimistic (b) duration, the project manager should estimate the...
Questions
question
Health, 16.03.2020 04:08
Questions on the website: 13722362