subject
Physics, 22.01.2020 02:31 Aliciaonfleek

In a shipping yard, a crane operator attaches a cable to a 1,400 kg shipping container and then uses the crane to lift the container vertically at a constant velocity for a distance of 40 m. determine the amount of work done (in j) by each of the following.

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 03:00
The respiratory system removes oxygen and water from the body. select the best answer from the choices provided t f
Answers: 2
question
Physics, 22.06.2019 11:20
If a rock is thrown upward on the planet mars with a velocity of 12 m/s, its height (in meters) after t seconds is given by h = 12t − 1.86t2. (a) find the velocity of the rock after two seconds. m/s (b) find the velocity of the rock when t = a. 12−3.72a m/s (c) when will the rock hit the surface? (round your answer to one decimal place.) t = s (d) with what velocity will the rock hit the surface? m/s
Answers: 1
question
Physics, 22.06.2019 16:20
What is the mass of the water that is being heated? it requires 2,500 joules to raise a certain amount of water (c = 4.186 jig c) from 20.0°c to 60.0°c. o 159 o 40 g o 63 g o 80 g
Answers: 2
question
Physics, 22.06.2019 16:50
Which is an example of an exothermic process?
Answers: 2
You know the right answer?
In a shipping yard, a crane operator attaches a cable to a 1,400 kg shipping container and then uses...
Questions
question
Mathematics, 07.06.2021 20:30
question
Mathematics, 07.06.2021 20:30
question
Social Studies, 07.06.2021 20:30
question
Mathematics, 07.06.2021 20:30
Questions on the website: 13722359