subject
Physics, 25.02.2020 18:04 Savageman4654

An equal-tangent crest vertical curve is designed with a PVI at station 110+00 (elevation 927.2 ft) and a PVC at station 107+43.3 (elevation 921.55 ft). If the high point is at station 110+75.5, what is the design speed of the curve?

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 22:30
Ann walks 80 meters on a straight line 33 ∘ north of east starting at point 1. draw ann's path. represent ann's walk with a vector of length 80 meters. draw the vector starting at point 1. the length given in the display is in meters.
Answers: 1
question
Physics, 22.06.2019 02:30
Agas contained within a piston-cylinder assembly undergoes three processes in series: process 12: compression with pv= constant from 1 bar and 1 liter to 4 bar. process 23: constant pressure expansion to 1 liter. process 31: constant volume calculate the pressure and volume at each state, and sketch the processes on a p-vdiagram labeled with pressure and volume values at each numbered stat
Answers: 2
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
question
Physics, 22.06.2019 15:00
What kind of simple machine is a catapult?
Answers: 1
You know the right answer?
An equal-tangent crest vertical curve is designed with a PVI at station 110+00 (elevation 927.2 ft)...
Questions
question
Mathematics, 19.11.2020 22:00
question
Mathematics, 19.11.2020 22:00
question
Mathematics, 19.11.2020 22:00
question
Mathematics, 19.11.2020 22:00
Questions on the website: 13722361