subject
Physics, 19.03.2020 23:58 blackkiki4352

A worker lifts a 20.0-kg bucket of concrete from the ground up to the top of a 25.0-m tall building. The bucket is initially at rest, but is traveling at 4.0 m/s when it reaches the top of the building. What is the minimum amount of work that the worker did in lifting the bucket

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 02:10
Which statement correctly describes the relationship between frequency and wavelength?
Answers: 2
question
Physics, 22.06.2019 12:10
An ionic compound can conduct electricity when a it is dissolved in water b its crystals are ground into powder c it is in solid form d it is heated to just below its melting point
Answers: 1
question
Physics, 22.06.2019 16:30
The total amount of energy contained in an object
Answers: 3
question
Physics, 22.06.2019 18:30
Arailroad car collides with and sticks to an identical railroad car that is initially at rest. after the collision, the total kinetic energy of the two cars is a) the same as before. b) half as much as before. c) one third as much as before. d) one fourth as much as before. e) twice as much as before.
Answers: 1
You know the right answer?
A worker lifts a 20.0-kg bucket of concrete from the ground up to the top of a 25.0-m tall building....
Questions
Questions on the website: 13722360