subject
Physics, 04.04.2020 02:30 zaymuney3063

The highest occupiable floor of any building is in the Sears Tower in Chicago. The elevators of the central tower of the building lift passengers 436.0 m above street level. If a continuous forces of 22310 N is exerted on one of these elevator cars as it travels from the ground to the top floor, how much work is done on the elevator car by the elevator's lifting mechanism?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 19:00
Modify the equation fδt=δ (mv) to find the force of friction.
Answers: 2
question
Physics, 21.06.2019 22:40
Which feature indicates that mars resides in the inner region of the solar system
Answers: 3
question
Physics, 22.06.2019 01:30
Ababy stroller is a rest on top of a hill which is 10 m high. the stroller and baby have a mass of 20 kg. what is the potential energy of the baby and stroller?
Answers: 1
question
Physics, 22.06.2019 03:30
Astudent is working in the lab to determine how time affect impulse the student keeps the force the same in each row but changes impact the time some data is shown witch trial has the greatest a student is working in the lab to determine how time affect impulse the student keeps the fours the same in each row but change is the impact time some data shown witch trial has the greatest impulse
Answers: 3
You know the right answer?
The highest occupiable floor of any building is in the Sears Tower in Chicago. The elevators of the...
Questions
question
Mathematics, 22.10.2020 19:01
question
Social Studies, 22.10.2020 19:01
question
Mathematics, 22.10.2020 19:01
question
Geography, 22.10.2020 19:01
Questions on the website: 13722359