Answers: 2
Physics, 22.06.2019 19:50
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
Physics, 23.06.2019 01:30
The amount of potential energy possessed by an elevated object is equal to
Answers: 2
Physics, 23.06.2019 02:30
Aprotein molecule in an electrophoresis gel has a negative charge.the exact charge depends on the ph of the solution, but 30 excesselectrons is typical. what is the magnitude of the electric forceon a protein with this charge in a 1500 n/c electric field?
Answers: 3
The layer of flux that floats to the top of molten metal during the smelting process is known as...
Social Studies, 23.04.2021 15:50
Mathematics, 23.04.2021 15:50
Mathematics, 23.04.2021 15:50
Computers and Technology, 23.04.2021 15:50
Mathematics, 23.04.2021 15:50
Mathematics, 23.04.2021 15:50
Mathematics, 23.04.2021 15:50
Computers and Technology, 23.04.2021 15:50
Biology, 23.04.2021 15:50
Mathematics, 23.04.2021 15:50