subject
Physics, 09.06.2020 23:57 demarpratt1270

The shortest path from a starting point to an endpoint, regardless of the path taken, is called the
A. vector addition
B. sum
C. shortest vector
D. resultant displacement

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 14:30
Suppose that 27 j of work is needed to stretch a spring from its natural length of 6 m to a length of 9 m. (a) how much work is needed to stretch the spring from 12 m to 14 m? j (b) how far beyond its natural length will a force of 78 n keep the spring stretched?
Answers: 2
question
Physics, 22.06.2019 14:40
What is the orbital period of a spacecraft in a low orbit near the surface of mars? the radius of mars is 3.4×106m.
Answers: 2
question
Physics, 23.06.2019 01:10
The path of a satellite orbiting the earth causes it to pass directly over two tracking stations a and b, which are 51 miles apart. when the satellite is on one side of the two stations, the angles of elevation at a and b are measured to be 87 degrees and 84 degrees, respectively. (a) how far is the satellite from station a? (b) how high is the satellite above the ground?
Answers: 3
question
Physics, 23.06.2019 20:00
If 25 ml of each of the liquids in the answer choices below were poured into a 100 ml beaker, which would form the second from the bottom layer? a. sea water – density of 1.024 g/ml b. mineral oil – density of 0.910 g/ml c. distilled water – density of 1.0 g/ml d. petroleum oil – density of 0.820 g/ml
Answers: 1
You know the right answer?
The shortest path from a starting point to an endpoint, regardless of the path taken, is called the...
Questions
question
Mathematics, 29.06.2019 07:10
question
History, 29.06.2019 07:10
question
English, 29.06.2019 07:10
question
Mathematics, 29.06.2019 07:10
question
Mathematics, 29.06.2019 07:10
Questions on the website: 13722360