subject
Physics, 04.07.2020 14:01 whitlee

The velocity of an object is given by the expression v(t) = 3.00 m/s + ( 4.00 m/s^3)t^2, where t is in seconds. Determine the position of the object as a function of time if it is located at x = 1.00 m at time t = 0.000 s

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 18:00
Which surface feature of the moon is characterized by mountainous areas? terrae craters maria regolith
Answers: 1
question
Physics, 21.06.2019 20:00
You notice a very one-dimensional-thinking snail crawling along one rail of a railroad track. naturally, you remove it to a safer place. but before you do, you observe it as it moves from position xi = -92.9 cm to position xf = -64.9 cm along the rail, as measured from a point where one rail abuts the next. what is the snail\'s displacement δx in centimeters?
Answers: 1
question
Physics, 22.06.2019 04:30
In a voltaic cell, electrons flow from the (positive/negative) to the (positive/negative) terminal.
Answers: 1
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You know the right answer?
The velocity of an object is given by the expression v(t) = 3.00 m/s + ( 4.00 m/s^3)t^2, where t is...
Questions
question
Mathematics, 30.10.2020 06:50
question
Mathematics, 30.10.2020 06:50
question
Mathematics, 30.10.2020 06:50
question
Mathematics, 30.10.2020 06:50
question
History, 30.10.2020 06:50
question
Geography, 30.10.2020 06:50
Questions on the website: 13722367