subject
Physics, 01.09.2020 18:01 acrespo3425

A crane on a building site lifts bricks of total mass 200kg, initially at rest on the ground, with uniform acceleration. When the bricks are 5m from the ground, they have a speed of 5m/s.
How much work is done during this process?
A) 2.5kJ
B) 10kJ
C) 12.5kJ
D) 35kJ

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 21:00
What can be found in every skeletal muscle? a. nerves, bones, cartilage, and connective tissue b. tendons, cartilage, nerves, and blood vessels c. muscle fibers, nerves, connective tissue, and blood vessels d. tendons, nerves, blood vessels, and bones
Answers: 1
question
Physics, 22.06.2019 05:00
At time t=0, a particle is located at the point (3,6,9). it travels in a straight line to the point (5,2,7), has speed 8 at (3,6,9) and constant acceleration 2i−4j−2k. find an equation for the position vector of the particle.
Answers: 2
question
Physics, 22.06.2019 13:00
Ways that industry and agriculture use physical properties to separate substances
Answers: 1
question
Physics, 23.06.2019 00:00
Determine the largest intensity w of the uniform loading that can be applied to the frame without causing either the average normal stress or the average shear stress at section b–b to exceed σ=19 mpa and τ=24 mpa, respectively.
Answers: 3
You know the right answer?
A crane on a building site lifts bricks of total mass 200kg, initially at rest on the ground, with u...
Questions
question
Mathematics, 28.08.2019 01:00
question
Mathematics, 28.08.2019 01:00
question
History, 28.08.2019 01:00
Questions on the website: 13722360