subject
Physics, 08.10.2020 14:01 anahitrejo1

A swimming pool has the shape of a right circular cylinder with radius 21 feet and height 10 feet. Suppose that the pool is full of water weighing 62.5 pounds per cubic foot. The work W required to pump all the water to the top of the pool is given by W = 4329507.37572 Correct: Your answer is correct. foot-pounds. The work W required to pump all the water to a platform 2 feet above the top of the pool is given by W = foot-pounds.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 15:00
The simple interest on a loan of $200 at 10 percent interest per year is $10 per year until the loan is paid off. $15 per year until the loan is paid off. $20 per year until the loan is paid off. $25 per year until the loan is paid off.
Answers: 2
question
Physics, 22.06.2019 02:50
20. threshold braking in the vehicle's braking system occurs when a. the brake pedal is pushed, heel on floorboard, with full foot pressure. b. the brakes are exerting full braking power, without traction loss. c. the driver begins pushing down the brake pedal, with moderate slowdown. d. the brakes just begin to take hold with a gradual slowdown.
Answers: 3
question
Physics, 22.06.2019 04:30
You are traveling in a car going at a constant speed of 100km/h down a long, straight highway. you pass another car going in the same direction which is traveling at a constant speed of 80km/h. as measured from your car's reference frame this other car is traveling at −20km/h. what is the acceleration of your car as measured from the other car's reference frame? what is the acceleration of the other car as measured from your car's reference frame?
Answers: 2
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
A swimming pool has the shape of a right circular cylinder with radius 21 feet and height 10 feet. S...
Questions
question
Computers and Technology, 13.02.2020 05:31
Questions on the website: 13722361