subject
Physics, 24.10.2020 01:00 isabellebisio

a bulldozer pushes a pile of dirt and rocks with a mass of 720 kg a distance of 22 m by applying a force of 5800 N. How much work was done by the bulldozer?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 14:30
You can decrease the resistance of a length of wire by
Answers: 2
question
Physics, 22.06.2019 21:40
Wo small variable-thrust jets are actuated to keep the spacecraft angular velocity about the z-axis constant at ? 0 = 1.16 rad/s as the two telescoping booms are extended from r1 = 1.18 m to r2 = 4.69 m at a constant rate over a period of 124 seconds. the small 19-kg experiment modules at the ends of the booms may be treated as particles, and the mass of the rigid booms is negligible. determine the necessary thrust t for each jet as a function of time where t = 0 is the time when the telescoping action is begun. after you have the general expression for t, answer the questions. show work.
Answers: 1
question
Physics, 23.06.2019 02:00
Elements on the periodic table are ordered according to their
Answers: 1
question
Physics, 23.06.2019 02:30
Atrain is traveling at 30.0 m/s relative to the ground in still air. the frequency of the note emitted by the train whistle is 262 hz. the speed of sound in air should be taken as 344 m/s. what frequency (f approach) is heard by a passenger on a train moving at a speed of 18.0 m/s relative to the ground in a direction opposite to the first train and approaching it? what frequency (f recede) is heard by a passenger on a train moving at a speed of 18.0 m/s relative to the ground in a direction opposite to the first train and receding from it?
Answers: 1
You know the right answer?
a bulldozer pushes a pile of dirt and rocks with a mass of 720 kg a distance of 22 m by applying a f...
Questions
question
Mathematics, 27.06.2019 19:30
question
Mathematics, 27.06.2019 19:30
Questions on the website: 13722362