Answers: 1
Physics, 22.06.2019 15:30
This is the number of complete movements of a wave per second.
Answers: 1
Physics, 22.06.2019 19:50
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
Physics, 22.06.2019 22:40
Which of the following is a direct benefit of the use of assembly lines in production a. laws against theft fraud and coercion are needed to protect free choice. b. the government needs to plan efficient outcomes. c. competition among producers by itself cannot ensure a wide range of consumer choices. d. works pressure the government to guarantee minimum wages
Answers: 2
A delusion is best characterized as...
English, 30.04.2021 17:50
Mathematics, 30.04.2021 17:50
Chemistry, 30.04.2021 17:50
Physics, 30.04.2021 17:50
History, 30.04.2021 17:50
Computers and Technology, 30.04.2021 17:50
French, 30.04.2021 17:50
Mathematics, 30.04.2021 17:50
Mathematics, 30.04.2021 17:50
Engineering, 30.04.2021 17:50
Mathematics, 30.04.2021 17:50
History, 30.04.2021 17:50