subject
Physics, 07.03.2021 21:50 usjalal

Part A: How much work is done when you push a crate horizontally with a 140 N across a 15 m factory floor? Part B : if the force of friction on the crate is steady 70 N, find the KE gained by crate

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 00:20
Aparticle of mass m is projected with an initial velocity v0 in a direction making an angle α with the horizontal level ground as shown in the figure. the motion of the particle occurs under a uniform gravitational field g pointing downward. (a) write down the lagrangian of the system by using the cartesian coordinates (x, y). (b) is there any cyclic coordinate(s). if so, interpret it (them) physically. (c) find the euler-lagrange equations. find at least one constant of motion. (d) solve the differential equation in part (c) and obtain x and y coordinates of the projectile as a function of time. (e) construct the hamiltonian of the system, h, and write down the hamilton’s equations (canonical equations) of motion.
Answers: 2
question
Physics, 22.06.2019 04:50
The position of a crate sliding down a ramp is given by x=(0.05t^3) m, y=(1.7t^2) m, z=(6−0.85t^5/2) m, where t is in seconds. (a) determine the magnitude of the crate's velocity when t = 2 s. (b) determine the magnitude of the crate's acceleration when t = 2 s.
Answers: 2
question
Physics, 22.06.2019 07:30
This is the substance(s) formed in a chemical reaction.
Answers: 1
question
Physics, 22.06.2019 09:00
The material that keeps its new shape after it is stretched is called?
Answers: 1
You know the right answer?
Part A: How much work is done when you push a crate horizontally with a 140 N across a 15 m factory...
Questions
question
Mathematics, 28.06.2019 01:30
question
Computers and Technology, 28.06.2019 01:30
question
Mathematics, 28.06.2019 01:30
question
Mathematics, 28.06.2019 01:30
Questions on the website: 13722363