subject
Physics, 22.03.2021 20:20 DrippyGanja

Need help ASAP PLZZZ A mover pushes a 65 kg crate up a ramp and onto a van. The mover exerts a
force of 484 N over a distance of 2.8 m. The final height of the crate when it is
on the van is 1.4 m relative to the ground. With what efficiency is the work
done by the mover converted into gravitational potential energy?

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 18:50
The summit of chimborazo, in ecuador, which is at a distance of about 6,384 km from the earth's center. the bottom of the mariana trench, in the western pacific ocean, which is nearly 6,370 km from the center of the earth. on the surface of earth on the equator line.
Answers: 1
question
Physics, 22.06.2019 02:00
What is the mass of the same rock on the earth
Answers: 2
question
Physics, 22.06.2019 14:30
Which compound is held together by the electrostatic force between two ions? a. co2 b. cci4 c. h2s d. mgf2
Answers: 1
question
Physics, 22.06.2019 19:00
According to an observer on earth, planet x is stationary. maria and samir depart earth on their spaceships at the same time, each flying at 0.5c. maria flies toward planet x and samir flies in the opposite direction. according to maria, her voyage to planet x takes 9 years. how many years does maria's voyage take according to samir?
Answers: 3
You know the right answer?
Need help ASAP PLZZZ A mover pushes a 65 kg crate up a ramp and onto a van. The mover exerts a
Questions
Questions on the website: 13722363