subject
Physics, 24.03.2021 17:20 kat1357

Workers use a force of 2125 N to push a piano weighing 8800 N up a 20.0 m long ramp. a.) How
much work is done on the piano by the workers in pushing it up the ramp?

b.) The piano is being
moved from street level to the second floor of a building. The second floor is 4.0 m above street level.
If the workers decide to lift the piano straight up by using ropes, how much work would they do?

c.) What is the efficiency of the ramp?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 13:20
Ball b is hanging from an inextensible cord. an identical ball a is released from rest when it is just touching the cord and drops through the vertical distance h a 5 8 in. before striking ball b. assuming e 5 0.9 and no friction, determine the resulting maximum vertical displacement h b of the ball b
Answers: 1
question
Physics, 21.06.2019 20:00
What are segments of dna that code for a particular trait. a combination of dna and proteins make up what
Answers: 1
question
Physics, 22.06.2019 05:20
Which statement is true? a. kepler's laws apply only to the motion of earth. b. kepler's laws can be used to predict eclipses. c. kepler's laws are true for a central force that is directly proportional to distance. d. kepler's laws can be deduced from newton's laws of motion and gravity.
Answers: 2
question
Physics, 22.06.2019 06:00
Juan created a chart to him study for a test. which headings best complete the chart? x: transparent objects y: opaque objects x: opaque objects y: transparent objects x: high frequency waves y: low frequency waves x: low frequency waves y: high frequency waves
Answers: 3
You know the right answer?
Workers use a force of 2125 N to push a piano weighing 8800 N up a 20.0 m long ramp. a.) How
...
Questions
question
Mathematics, 01.07.2021 04:40
question
Mathematics, 01.07.2021 04:40
Questions on the website: 13722362