subject
Physics, 26.03.2021 16:20 BreBreDoeCCx

During an investigation about the freezing point of water, Joshua and his group measured the temperature of a cup of liquid water placed in the freezer, every two minutes. The group recorded the different temperatures in a table they created and this happened for the entire class (60
minutes). What type of data did the group collect?
O kinesthetic data
O quantitative data
O qualitative data
O visual data

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 20:50
Identify the type of synthetic material used in each object
Answers: 1
question
Physics, 22.06.2019 12:40
Afrequency generator sends a 550 hz sound wave through both water and ice. what is the difference in wavelength between the wave produced in ice and the wave produced in water?
Answers: 3
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
question
Physics, 22.06.2019 13:40
Use the profile illustrated for problem (1). assume that the layer of silty sand fill (sm) is placed over the entire site. estimate the thickness of the fill (h - in feet) that will cause the effective vertical stress at the center of the clay layer to increase by 517.5 pounds per square foot.
Answers: 1
You know the right answer?
During an investigation about the freezing point of water, Joshua and his group measured the tempera...
Questions
question
Mathematics, 14.12.2020 14:00
question
Mathematics, 14.12.2020 14:00
Questions on the website: 13722359