subject
Physics, 13.10.2019 13:00 jovillo

Compute the work performed when 14 packages weighing 2 newtons each are raised 5 meters.

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 04:50
*drag each tile to the correct location in the sequence* the table shows chronological events in the life of our sun, a medium-sized star. place the missing events into the correct rows of the table.
Answers: 3
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 11:30
Why is the energy that results from a roller coaster's position at the top of a hill referred to as potential energy?
Answers: 1
question
Physics, 22.06.2019 16:00
The field between two charged parallel plates is kept constant. if the two plates are brought closer together, the potential difference between the two plates either a) decrease b) does not change c) increase?
Answers: 3
You know the right answer?
Compute the work performed when 14 packages weighing 2 newtons each are raised 5 meters....
Questions
question
History, 26.10.2020 01:10
question
Physics, 26.10.2020 01:10
question
Mathematics, 26.10.2020 01:10
question
Mathematics, 26.10.2020 01:10
question
Mathematics, 26.10.2020 01:10
Questions on the website: 13722367