subject
Physics, 05.11.2019 12:31 jhony42

The deputy director of operations and construction sent a schedule of airport construction projects to the other deputies at the airport. this is an example of which type of organizational message?
a. informal grapevine
b. formal lateral
c. formal downward
d. formal upward


The deputy director of operations and construction sent a schedule of airport construction projects

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 07:30
The slope of a velocity time graph over any interval of time gives the during that interval
Answers: 2
question
Physics, 22.06.2019 16:00
The solid that is formed and usually sinks to the bottom of a solution is the
Answers: 2
question
Physics, 22.06.2019 16:00
Which composition of water moves to begin a deepwater current?
Answers: 2
question
Physics, 22.06.2019 19:10
Global warming will produce rising sea levels partly due to melting ice caps but also due to the expansion of water as average ocean temperatures rise. to get some idea of the size of this effect, calculate the change in length (in m) of a column of water 1.45 km high for a temperature increase of 1.12°c. assume the column is not free to expand sideways. as a model of the ocean, that is a reasonable approximation, as only parts of the ocean very close to
Answers: 3
You know the right answer?
The deputy director of operations and construction sent a schedule of airport construction projects...
Questions
question
Medicine, 17.12.2021 14:00
question
Mathematics, 17.12.2021 14:00
question
Physics, 17.12.2021 14:00
question
Mathematics, 17.12.2021 14:00
question
Geography, 17.12.2021 14:00
question
Mathematics, 17.12.2021 14:00
question
Mathematics, 17.12.2021 14:00
Questions on the website: 13722359