subject
Physics, 22.11.2019 04:31 cristykianpour

Aconstruction worker pushes a cement block with a 750 n force for 10 minutes without the cement block moving. how much work did the construction worker do during the 10 minutes

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 12:00
Under the action of a constant force an object accelerates at 7.8 m/s2. what will the acceleration be if (a) the force is halved? (b) the object's mass is halved? (c) the force and the object's mass are both halved? (d) the force is halved and the object's mass is doubled?
Answers: 3
question
Physics, 22.06.2019 12:20
Aball with a mass of 275 g is dropped from rest, hits the floor and rebounds upward. if the ball hits the floor with a speed of 2.40 m/s and rebounds with a speed of 1.70 m/s, determine the following. (a) magnitude of the change in the ball's momentum (let up be in the positive direction.)
Answers: 1
question
Physics, 22.06.2019 13:40
Use the profile illustrated for problem (1). assume that the layer of silty sand fill (sm) is placed over the entire site. estimate the thickness of the fill (h - in feet) that will cause the effective vertical stress at the center of the clay layer to increase by 517.5 pounds per square foot.
Answers: 1
question
Physics, 22.06.2019 14:30
Which compound is held together by the electrostatic force between two ions? a. co2 b. cci4 c. h2s d. mgf2
Answers: 1
You know the right answer?
Aconstruction worker pushes a cement block with a 750 n force for 10 minutes without the cement bloc...
Questions
question
English, 28.08.2019 16:00
Questions on the website: 13722363