subject
Physics, 10.10.2021 14:00 AndiLizzi

If a 2kg block of copper is heated and a temperature increase of 50C is measured, how much energy has been provided?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 18:30
A10.0 kg cart and a 15kg cart are locked together with a compressed spring between them. they are then released so that the spring pushes the two carts apart. the 10.0 kg cart is moving at 4.5 m/s afterward. how fast is the 15kg cart moving? 3.0 m/s 2.0 m/s 4.5 m/s 5.0 m/s
Answers: 1
question
Physics, 22.06.2019 02:00
Aplane travels 1000 miles in 5 hours .what is the planes average speed?
Answers: 2
question
Physics, 22.06.2019 11:00
1.)the isotope cobalt-60 has a nuclear mass of 59.933820 u calculate the mass defect of cobalt-60 using the following information. mass of proton: 1.007825 u mass of neutron: 1.008665 u 1 u = 931.5 mev 2.)the isotope cobalt-60 has a nuclear mass of 59.933820 u calculate the binding energy of cobalt-60 using the following information. mass of proton: 1.007825 u mass of neutron: 1.008665 u 1 u = 931.5 mev 3.)the isotope cobalt-60 has a nuclear mass of 59.933820 u calculate the binding energy per nucleon of cobalt-60 using the following information. mass of proton: 1.007825 u mass of neutron: 1.008665 u 1 u = 931.5 mev
Answers: 3
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You know the right answer?
If a 2kg block of copper is heated and a temperature increase of 50C is measured, how much energy ha...
Questions
question
English, 29.05.2021 03:10
Questions on the website: 13722362