subject
Physics, 16.10.2021 01:40 savagesquid4807

How do we know that the amount of contaminated soil remaining is a linear function of the number of days worked? The amount of contaminated soil remaining decreases at a constant rate based on the number of days worked, so the function is linear. As the number of days worked increases the amount of contaminated soil remaining decreases, so the function is linear As the amount of contaminated soil decreases the number of work days increases, so the function is linear. The number of days worked is always greater than or equal to zero, so the function is linear. The amount of contaminated soil remaining is always greater than zero, so the function is linear. Part 2 State the formula for the amount of contaminated soil remaining, R, as a linear function of the number of days worked, n. Use the formula to determine the amount of contaminated soil remaining after 31 days of work. Submit Answer

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 20:30
Asmall metal bar, whose initial temperature was 10° c, is dropped into a large container of boiling water. how long will it take the bar to reach 70° c if it is known that its temperature increases 2° during the first second? (the boiling temperature for water is 100° c. round your answer to one decimal place.) sec how long will it take the bar to reach 98° c? (round your answer to one decimal place.)
Answers: 2
question
Physics, 22.06.2019 04:10
Calculate the work done by an external agent during an isothermal compression of 1.00 mol of oxygen from a volume of 22.4 l at 10∘c and 1.0 atm pressure to 16.8l
Answers: 2
question
Physics, 22.06.2019 09:30
Asap i'm in class rn a 1,000-kg car is traveling 20 m/s on a flat stretch of road. it gets to a hill and coasts uphill until it stops. how high up the hill does the car travel? givens: equation: 1/2mv2initial=mghfinal solve for h. plug & chug, label.
Answers: 2
question
Physics, 22.06.2019 10:20
Asmall object with mass 0.200 kg swings back and forth on the lower end of a light rope that is 3.00 m long. the upper end of the rope is attached to the ceiling. as the object swings through its lowest position, where the rope is vertical, the speed of the object is 5.80 m/s. at this point in the motion, what is the tension in the rope? (use g = 9.80 m/s2.)
Answers: 2
You know the right answer?
How do we know that the amount of contaminated soil remaining is a linear function of the number of...
Questions
question
Mathematics, 17.12.2020 17:30
question
Mathematics, 17.12.2020 17:30
question
Mathematics, 17.12.2020 17:30
Questions on the website: 13722360